No. 32619
July 31, 2008 |
|
Le 31 juillet 2008 |
|
|
|
Coram: McLachlin C.J. and Fish and Rothstein JJ. |
|
Coram : La juge en chef McLachlin et les juges Fish et Rothstein |
|
|
|
BETWEEN:
Ingobert Ido Wolfram Seidler, Maria Seidler, Roman Franz Seidler and Roswitha Seidler
Applicants
‑ and ‑
Gebhard Hoelzler Construction Ltd.
Respondent
|
|
ENTRE :
Ingobert Ido Wolfram Seidler, Maria Seidler, Roman Franz Seidler et Roswitha Seidler
Demandeurs
‑ et ‑
Gebhard Hoelzler Construction Ltd.
Intimée
|
|
|
|
JUDGMENT
The applications for an extension of time to serve and file the application for leave to appeal and the respondent’s response are granted. The motions to adduce new evidence and for an extension of time to serve and file a response to the motion to adduce new evidence are dismissed. The application for leave to appeal from the judgment of the Court of Appeal for British Columbia (Vancouver), Number CA034162, 2008 BCCA 77 dated February 22, 2008, is dismissed with costs.
|
|
JUGEMENT
Les demandes de prorogation de délai pour signifier et déposer la demande d’autorisation d’appel et la réponse de l’intimée sont accordées. Les requêtes pour déposer de nouveaux éléments de preuve et de prorogation de délai pour signifier et déposer la réponse à la requête pour déposer de nouveaux éléments de preuve sont rejetées. La demande d’autorisation d’appel de l’arrêt de la Cour d’appel de la Colombie‑Britannique (Vancouver), numéro CA034162, 2008 BCCA 77 daté du 22 février 2008, est rejetée avec dépens.
|
|
|
|
C.J.C.
J.C.C.