Demandes d'autorisation

Informations sur la décision

Contenu de la décision

No. 41194     

 

 

Revised on September 12, 2024

August 29, 2024

 

Révisé le 12 septembre 2024

Le 29 août 2024

 

 

 

 

BETWEEN:

 

GreenBlue Urban North America Inc.

Applicant

- and -

 

Deeproot Green Infrastructure, LLC and Deeproot Canada Corp.

Respondents

 

 

ENTRE :

 

GreenBlue Urban North America Inc.

Demanderesse

- et -

 

Deeproot Green Infrastructure, LLC et Deeproot Canada Corp.

Intimées

 

 

 

JUDGMENT

 

The motion for an extension of time to serve and file the application for leave to appeal from the judgment of the Federal Court of Appeal, Number A-181-21, 2023 FCA 184, dated September 13, 2023, is dismissed without costs. In any event, had the motion for an extension of time to serve and file the application for leave to appeal been granted, the application for leave to appeal would have been dismissed.

 

 

The application for leave to appeal from the judgment of the Federal Court of Appeal, Number A-181-21, 2024 FCA 19, dated January 25, 2024, is dismissed with costs.

 

 

JUGEMENT

 

La requête en prorogation du délai de signification et de dépôt de la demande d’autorisation d’appel de l’arrêt de la Cour d’appel fédérale, numéro A-181-21, 2023 FCA 184, daté du 13 septembre 2023, est rejetée sans dépens. Quoi qu’il en soit, même si la requête en prorogation du délai de signification et de dépôt de la demande d’autorisation d’appel avait été accueillie, la demande d’autorisation d’appel aurait été rejetée.

 

La demande d’autorisation d’appel de l’arrêt de la Cour d’appel fédérale, numéro A‑181-21, 2024 FCA 19, daté du 25 janvier 2024, est rejetée avec dépens.

 

 

 

 

 

J.S.C.C.

J.C.S.C.

 Vous allez être redirigé vers la version la plus récente de la loi, qui peut ne pas être la version considérée au moment où le jugement a été rendu.